American Journal of Applied Mathematics and Statistics. 2019, 7(2), 79-85
DOI: 10.12691/AJAMS-7-2-5
Probabilistic Analysis of a Ceramic Tile Production System Considering Various Redundant Subsystems and Inspection
Reena1, and Rajeev Kumar1
1Department of Mathematics, M.D. University, Rohtak (Haryana), India
Pub. Date: March 29, 2019
Cite this paper
Reena and Rajeev Kumar. Probabilistic Analysis of a Ceramic Tile Production System Considering Various Redundant Subsystems and Inspection.
American Journal of Applied Mathematics and Statistics. 2019; 7(2):79-85. doi: 10.12691/AJAMS-7-2-5
Abstract
The present paper gives analysis of a stochastic model for a ceramic tile production system considering its five main subsystems viz. Ball Mill, Spray Dryer, Hydraulic Press, Glaze Line and Kiln and a storage system, Silo. It was considered that the failure of Ball Mill and Spray Dryer subsystems depends upon Silo while failure of other subsystems are independent of Silo. Also the storage in Silo is consumed during the repair/replacement of the failed subsystems then the system goes to failure otherwise it is operative. During the occurrence of failure in subsystems Hydraulic Press, Glaze Line and Kiln, leads to the failure in other subsequent subsystem and the repairman first inspects in which redundant unit of the subsystem has a fault and then accordingly repair/replacement is carried out. The system has been analysed using Markov process and regenerative point techniques. Various conclusions for the system regarding its reliability and availability are drawn by plotting several graphs for a particular case.
Keywords
ceramic tile production system, stochastic model, reliability, availability, Markov process and regenerative point technique
Copyright
This work is licensed under a Creative Commons Attribution 4.0 International License. To view a copy of this license, visit
http://creativecommons.org/licenses/by/4.0/
References
[1] | Kulshreshtha DK (1970). “Reliability of a repairable multi-component system with redundancy in parallel”, IEEE Trans. Reliability 19, 50-52. |
|
[2] | EL-Said, K.M. and M.S. EL-Sherbeny (2010). “Stochastic Analysis of a Two-Unit Cold Standby System with Two-Stage Repair and Waiting Time”, Sankhya: the Indian journal of Statistics, 72(B), 1-10. |
|
[3] | Yusuf, B. and I. Yusuf (2013). “Evaluation Some Reliability Characteristics of a System under Three Types of Failures with Repair-Replacement at Failure”, American Journal of Operational Research, 3(3), 83-91. |
|
[4] | Taneja, G. and S. Sachdeva (2016). “Availability and Profit Analysis of Uni-directional and Revertible 1:1 Protection Scheme in Optical Communication Process”, International Journal of Pure and Applied Mathematics, 111 (3), 381-391. |
|
[5] | Rajesh, G. Taneja and P. Jagdish (2018). “Reliability of a Gas Turbine System with Change in Weather and Optimisation of Electricity Price when Working in Single Cycle”, Int. J. Agricult. Stat. Sci. 14(1), 119-128. |
|
[6] | Black, G. and Proschan, F. (1959). “On optimal redundancy”, Operations Research, 7(5), 581-588. |
|
[7] | Arora JR (1976). “Reliability of several standby priority redundant systems”, IEEE Trans. Reliability, 26, 290-293. |
|
[8] | Dhillon BS (1980). “Multistate device redundant system with common cause failures and one standby unit”, Microelectronics and Reliability 20(4), 411-417. |
|
[9] | Wang KH, Dong WL and Ke JB (2006). “Comparison of Reliability and Availability Between Four Systems with Warm Standby Components and Standby Switching Failure”, Applied Mathematics and Computation, 183, 1310-1322. |
|
[10] | Reena and Rajeev Kumar (2018). “Profit and Reliability Analysis of a Ceramic Tile Production System Considering Various Subsystem Failures”, International Journal of Applied Engineering Research, 13(10), 8436-8446. |
|