Skip Navigation Links.
Collapse <span class="m110 colortj mt20 fontw700">Volume 12 (2024)</span>Volume 12 (2024)
Collapse <span class="m110 colortj mt20 fontw700">Volume 11 (2023)</span>Volume 11 (2023)
Collapse <span class="m110 colortj mt20 fontw700">Volume 10 (2022)</span>Volume 10 (2022)
Collapse <span class="m110 colortj mt20 fontw700">Volume 9 (2021)</span>Volume 9 (2021)
Collapse <span class="m110 colortj mt20 fontw700">Volume 8 (2020)</span>Volume 8 (2020)
Collapse <span class="m110 colortj mt20 fontw700">Volume 7 (2019)</span>Volume 7 (2019)
Collapse <span class="m110 colortj mt20 fontw700">Volume 6 (2018)</span>Volume 6 (2018)
Collapse <span class="m110 colortj mt20 fontw700">Volume 5 (2017)</span>Volume 5 (2017)
Collapse <span class="m110 colortj mt20 fontw700">Volume 4 (2016)</span>Volume 4 (2016)
Collapse <span class="m110 colortj mt20 fontw700">Volume 3 (2015)</span>Volume 3 (2015)
Collapse <span class="m110 colortj mt20 fontw700">Volume 2 (2014)</span>Volume 2 (2014)
Collapse <span class="m110 colortj mt20 fontw700">Volume 1 (2013)</span>Volume 1 (2013)
American Journal of Applied Mathematics and Statistics. 2018, 6(3), 109-114
DOI: 10.12691/AJAMS-6-3-4
Original Research

Reliability and Profit Analysis of a Two-unit Non-identical Standby System in Snowstorm Weather Conditions

Narender Singh1, , Dalip Singh1 and Meenaxi1

1Department of mathematics, M.D. University, Rohtak, India

Pub. Date: June 22, 2018

Cite this paper

Narender Singh, Dalip Singh and Meenaxi. Reliability and Profit Analysis of a Two-unit Non-identical Standby System in Snowstorm Weather Conditions. American Journal of Applied Mathematics and Statistics. 2018; 6(3):109-114. doi: 10.12691/AJAMS-6-3-4

Abstract

This paper express reliability measures of a cold standby system which have two units. In cold standby system one unit operative and other unit kept as a spare. In the system both the unit kept as non-identical. The each operative unit fails due to snowstorm with different failure rate. The system completely failed when the both two units are failed. The failed unit cannot be operative directly by the repairman. The failed unit under the snow, first digging out from the snow then hospitalize (repair) the unit after that the unit becomes operative. Some properties of reliability system such as mean time to system failure, availability and profit have been computed. At last particular cases have been taken to explain the model.

Keywords

non-identical units, snowstorms, digging out

Copyright

Creative CommonsThis work is licensed under a Creative Commons Attribution 4.0 International License. To view a copy of this license, visit http://creativecommons.org/licenses/by/4.0/

References

[1]  Osaki, Reliability Analysis of a Two-Unit Standby-Redundant System with Preventive Maintenance IEEE Transactions on Reliability, 21, 24-29, 1972
 
[2]  Gupta,P.P and Agarwal, S.C A Parllel Redundant Complex System with Two Types of Failure under Preemptive¨CRepeat Repair Discipline Microelectronics Reliability. 24(3), 395-409, 1984.
 
[3]  Gupta, P.P and Sharma, M.K. Reliability and MTTF Evaluation of a Two Duplex Standby System with Two Types of Repair Microelectronics Reliability, 33(3), 291-305, 1993.
 
[4]  Taneja, G., Tuteja, R.K., and Arora, R.T., Analysis of Two-Unit System with Partial Failures and Three Types of Repair Reliability Engineering and System Safety, 33,199-214,1991.
 
[5]  Taneja, G., Tuteja, R.K., Cost-benefit analysis of a two-server, two-unit, warm standby system with different types of failure Microelectronics Reliability, 32, 1353-1359, 1992.
 
[6]  Singh, D. and Taneja,G. Comparative of a Power Plant comprising one steamturbine with respect to two types of inspection IJSCE, 6, 331-338, 2014.
 
[7]  Malhotra R., Taneja G.,Comparative study between a single unit system and a two ¨Cunit cold standby systemwith varying demand, Springer Plus, 4, 1-17, 2015.
 
[8]  Chandrasekhar P., Natrajan R. A study on a two-unit standby system with Erlangian repair time Asia-Pacific Journal of Operational Research, 21(3), 271-277, 2015.
 
[9]  Manocha A. and Taneja G. Stochastic Analysis of a two-unit standby system with arbitrary distributions for life, repair and waiting times 11(3), 293-299, 2015.
 
[10]  Goel L.R., Sharma G.C., Gupta R. Cost analysis of a two-unit cold standby system under different weather conditions Microelectron Reliab, 25(4), 655-659, 1985.
 
[11]  Gupta, R., and Goel, R. Profit analysis of a two-unit cold standby system with abnormal weather condition Microelectronics Reliability, 31(1), 1-5, 1991.
 
[12]  Goel L.R., Kumar A. and Rastogi A. K. Stochastic Behaviour of Man-Machine Systems Operating Under Different Weather Conditions Microelectron Reliab, 25(1), 87-91, 1985.
 
[13]  S.N., S.D and Saini A.K., Cost-Benefit analysis of two identical warm standby system subject to under heavy rain with partially operative after repair International Journal of Pure and Applied Mathematics, 114(3), 503-514, 2017.
 
[14]  Nailwal B. and Singh S.B. Reliability and Sensitivity analysis of an operating system with inspection in different weather conditions International Journal of Reliability and Safety Engineering, 19(2), 1250009 (36 pages), 2014.