Skip Navigation Links.
Collapse <span class="m110 colortj mt20 fontw700">Volume 12 (2024)</span>Volume 12 (2024)
Collapse <span class="m110 colortj mt20 fontw700">Volume 11 (2023)</span>Volume 11 (2023)
Collapse <span class="m110 colortj mt20 fontw700">Volume 10 (2022)</span>Volume 10 (2022)
Collapse <span class="m110 colortj mt20 fontw700">Volume 9 (2021)</span>Volume 9 (2021)
Collapse <span class="m110 colortj mt20 fontw700">Volume 8 (2020)</span>Volume 8 (2020)
Collapse <span class="m110 colortj mt20 fontw700">Volume 7 (2019)</span>Volume 7 (2019)
Collapse <span class="m110 colortj mt20 fontw700">Volume 6 (2018)</span>Volume 6 (2018)
Collapse <span class="m110 colortj mt20 fontw700">Volume 5 (2017)</span>Volume 5 (2017)
Collapse <span class="m110 colortj mt20 fontw700">Volume 4 (2016)</span>Volume 4 (2016)
Collapse <span class="m110 colortj mt20 fontw700">Volume 3 (2015)</span>Volume 3 (2015)
Collapse <span class="m110 colortj mt20 fontw700">Volume 2 (2014)</span>Volume 2 (2014)
Collapse <span class="m110 colortj mt20 fontw700">Volume 1 (2013)</span>Volume 1 (2013)
American Journal of Applied Mathematics and Statistics. 2014, 2(2), 83-87
DOI: 10.12691/AJAMS-2-2-6
Original Research

Availability and Profit Analysis of a linear Consecutive 2-out-of-4 Repairable System with Units Exchange

U.A. Ali1 and Ibrahim Yusuf2,

1Department of Mathematics, Usmanu Danfodio University, Sokoto, Nigeria

2Department of Mathematical Sciences, Faculty of Science, Bayero University, Kano, Nigeria

Pub. Date: March 13, 2014

Cite this paper

U.A. Ali and Ibrahim Yusuf. Availability and Profit Analysis of a linear Consecutive 2-out-of-4 Repairable System with Units Exchange. American Journal of Applied Mathematics and Statistics. 2014; 2(2):83-87. doi: 10.12691/AJAMS-2-2-6

Abstract

In this paper, we study some reliability characteristics of a repairable linear consecutive 2-out-of-4 system. The system work when to two units in a row (consecutive) works. The system is attended by three repairmen. When an operating unit failed, a standby is switched on or an idle operating unit is exchange with the failed unit. The explicit expressions of the reliability characteristics such availability, busy period of the repairmen and profit function are derived. Some cases are analyzed graphically to investigate the impact of system parameters on availability and profit.

Keywords

availability, profit, repairable system

Copyright

Creative CommonsThis work is licensed under a Creative Commons Attribution 4.0 International License. To view a copy of this license, visit http://creativecommons.org/licenses/by/4.0/

References

[1]  A. Khatab, N. Nahas, and M. Nourelfath, Availbilty of k-out-of-n: G systems with non identical components subject to repair priorities. Reliab. Eng. Syst. Safety. 94, 2009, 142-151.
 
[2]  I. Yusuf, Availability and profit analysis of 3-out-of-4 repairable system with preventive maintenance, International Journal of Applied Mathematical Research, 1 (4), 2012, pp 510-519.
 
[3]  I. Yusuf, and B. Yusuf, Evaluation of reliability characteristics of two dissimilar network flow systems. Applied Mathematical Sciences, Vol. 7, No. 40, 2013, pp 1983-1999.
 
[4]  I.Yusuf, and N. Hussaini, Evaluation of Reliability and Availability Characteristics of 2-out of -3 Standby System under a Perfect Repair Condition American Journal of Mathematics and Statistics, Vol. 2No. 5, 2012, pp 114-119.
 
[5]  J. Shao, and L.R. Lamberson, Modeling shared-load k-out-of-n : G systems IEEE Trans. Reliab., 40: 1991.
 
[6]  K.M. El-Said, Cost analysis of a system with preventive maintenance by using Kolmogorov’s forward equations method, American Journal of Applied Sciences, Vol. 5,No. 4, 2008, pp 405-410.
 
[7]  K.M.El-Said, and M.S. El-Sherbeny, Evaluation of reliability and availability characteristics of two different systems by using linear first order differential equations, Journal of Mathematics, and Statistics, Vol. 1 No. 2, 2005, pp 119-123.
 
[8]  M. Y. Haggag, “Cost analysis of a system involving common cause failure and preventive maintenance, ”Journal of Mathematics and Statistics, Vol. 5, No. 4, 2009, pp 305-310.
 
[9]  Y. Barron, E. Frostig and B.Levikson, Analysis of r out of n systems with several repairmen, exponential life times and phase type repair times: an algorithmic approach. Eur. J. Oper. Res. Algorithm Approach 169, 2006, pp 202-225.